Board of TrusteesLos Angeles Community College District |
ACTION |
|
|
|
Com. No. BSD2 |
Division Operations Division – Business Services |
Date June 25, 2003 |
Subject:
FACILITIES PLANNING AND
DEVELOPMENT ROUTINE REPORTS
I. AUTHORIZE FINAL PROJECT PROPOSALS
(FPP)
Authorize the annual transmittal of
funding requests to the State Chancellor’s
Office for Final Project Proposals
(FPP) for the fiscal year 2005-06 pursuant
to the Education Code Section 81820
et. Seq.
COLLEGE PROJECT CATEGORY
East Math Science
Complex B
or C
Harbor Child Development
Center D-1
Mission Health and P. E.
Building D-1
Pierce Life Sciences,
Physics, Chemistry, C
And
Vacated Space Renovation
Trade-Technical A-Building Renovation C
Valley New
Library/Learning Assistance B
Center
Background: The
District’s capital construction needs are outlined in the
Five-Year Capital Construction Plan; a
planning document used by
the State Chancellor’s Office and the
District to identify ongoing and future
projects, schedules, enrollment
projections, facility capacity and utilization,
and funding needs. Funding proposals for projects in the plan
first take the
form of an Initial Project Proposal
(IPP). The IPP is conceptual in nature and
serves as a funding request for funds
three (3) years in advance. An FPP is
a comprehensive, project-specific
document and requests funds two (2)
years in advance.
II. AUTHORIZE AMENDMENT OF SERVICE
AGREEMENTS
A. Authorize Amendment No. 1
of Agreement No. 01-0013 with MTLG. Inc. to provide additional inspection and
testing for the “Ceiling and Lighting Replacement and Upgrade” project at Los
Angeles Valley College for an additional amount of $ 1,103.
Background: This agreement was authorized by the Board of Trustees on June 13
2001 (Com. No. BSD 3). The construction
of this project requires compression testing and inspection throughout the
project, and testing that was not in the original scope is now needed. This
revised agreement total is $21,103 with this amendment. Funding is through
Federal Emergency Management Agency (FEMA) under Hazard Mitigation Grant
Program with a college match of 25% from the state State of California Departeme
of General Services Lease Purchase Transaction.
B. Authorize amendment No. 2 of
Agreement No. 01-0015 with BPI Inspection to provide additional inspection and
testing for the project “Remodel for Efficiency” at Los Angeles Valley College
for an additional amount of $
40,150.
Background: This agreement was authorized by the Board of Trustees on June 13
2001 (Com. No. BSD 3). Additional
quality control and inspection was required for completion of this project. This agreement totals $90,150 with this
amendment. Funding is through the
1999-2000 State Capital Outlay Program.
Authorize an
agreement with Airdraulics for the project “Installation of Automotive Lifts”
at Los Angeles Trade-Technical College in the amount of $164,700.
Background: This contract is the result of competitive bidding. One (1) bid package was requested; one bid was received, for the amount of $164,700.
Funding is through a
Directed Grant for the State of California, Department of Education, through
the efforts of Congresswomen Lucille Roybal-Allard.
The funds come from a Federal Grant.
The Project Title is listed as Directed Grant, 84.116Z under authority
of PL 105-277 Omnibus Appropriation Act, Fund for the Improvement of Postsecondary
Education. Award period: 5/1/02 - 9/30/03. Grant nofification comes from the U.S. Department of Education.
IV. RATIFY
CHANGE ORDER AND AUTHORIZE ACCEPTANCE OF COMPLETION OF CONSTRUCTION CONTRACTS
A.
Authorize the following actions on Agreement 4500010504 with Graycon Inc. for the project “Boiler
Replacement” at Los Angeles Mission College.
1.
Ratify Change Order No. 1, in the amount of $ 4,691.50
-
add 2” Clay bypass valve
2.
Authorize Acceptance of Completion with a substantial completion date of
May 23, 2003.
Background: This agreement was ratified by the Board of
Trustees on June 11, 2003 (Com. No. BSD2).
Additional work not in the original scope was required to equalize water
tempeture in the main loop. Total change orders, are $4,691.50 or 4.7% of the
original contract amount. This contract totals $104,200 with this change order.
Funding of $64,000 is through the
1999-2000 Scheduled Maintenance Program and $40,200 is through the 2000-2001
Scheduled Maintenance Program, with a 50% District match for each program.
B.
Authorize the following
actions on Agreement No. 99-1025 with First Fire Systems Inc., for the project
“Replace Fire Alarm System Campus-wide” at Los Angeles Trade-Technical College.
1. Ratify Change Order No. 2 in the amount of $2,108.76 and a time extension of 120 days.
-add one pull station and fire suppression element $1,458.54
-additional Data Wire $ 650.22
2.
Authorize Acceptance of
Completion with a Substantial completion date of April 30, 2003.
Background: This agreement
was authorized by the Board of
Trustees on April 14, 1999 (Com No. BSD2). Additional labor and materials were
required to accommodate the college’s ongoing programs and to address field
requests from the Division of the State Architect. Total change orders to date are $10,196.45 or 2% of the original
contract amount. This project totals
$504,796.45 with this change order.
This change order is funded through the 2000-2001 Scheduled Maintenance
Program with a 50% district match.
V. AUTHORIZE ADOPTION OF CONSTRUCTION
PLANS AND SPECIFICATIONS
A. Authorize the adoption of plans and
specifications for the project, “Replace Diesel Fire Pumps” at West Los Angeles
College.
Background: In accordance with Public Contract Code Section
22039, the Board shall adopt the plans and specifications for the project prior
to bidding the construction work on the project. The project plans and specifications have been designed and
developed by a licensed professional engineer and reviewed by the Los Angeles
Community College District Facilities Planning and Development Director or
designee.
B. Authorize the adoption of plans and
specifications for the project, “Replace Campus Security System and Wiring” at
West Los Angeles College.
Background: In accordance with Public Contract Code
Section 22039, the Board shall adopt the plans and specifications for the
project prior to bidding the construction work on the project. The project plans and specifications have
been designed and developed by a licensed professional engineer and reviewed by
the Los Angeles Community College District Facilities Planning and Development
Director or designee.
C.
Authorize the adoption
of plans and specifications for the project, “Replace Irrigation Water Mains” at
West Los Angeles College.
Background: In
accordance with Public Contract Code Section 22039, the Board shall adopt the
plans and specifications for the project prior to bidding the construction work
on the project. The project plans and
specifications have been designed and developed by a licensed professional
engineer and reviewed by the Los Angeles Community College District Facilities
Planning and Development Director or designee.
|
Chancellor and Secretary to the Board of Trustees
By:______________________________ Date_________________
|
Candaele ____________ Pearlman ______________ Field ________________ Scott-Hayes____________ Furutani _____________ Waxman_______________ Mercer _______________ Ramos_________________ Student Trustee Advisory Vote |